![]() |
|
|
Inside
|
Post
|
||||
|
Inside
Diameter
|
Diameter
|
Shrink
|
Full
|
||
|
Before
Shrinking
|
After
|
Wall
|
Spool
|
||
|
(minimum)
|
Shrinking
|
Thickness
|
Length
|
Price
|
Color
Selection
|
|
(maximum)
|
(For clear use A2)
The above lead time guidelines are estimated only. They may be longer (not usually) or they may be shorter (typically). Regarding products with 100 & 200 day lead time; pricing may vary, and a minimum order with deposit may be required. Oh... and by the way, everything can change without notice and/or liability. |